Thursday, July 31, 2025

Enhancing Ohsojang's Antique Shop Modular Building (Part One)

 

Hey brick fans, welcome back to my blog!

I recently picked up this beautiful modular building from Temu.  It's produced by a new brand called Xbert and the set is designed by one of my favourite MOC builders Ohsojang (aka shinjungseub).

I did a detailed set review on my other blog which you can find here.

Anyways I love the architecture of the set and all of the nice details that the set contains.  However it's a bit small when compared to some of my other modular buildings.   The building footprint is about the same as the Lego Parisian restaurant in terms of width and depth, but the baseplate that it sits on isn't a standard 16x32 or 32x32 stud, which is what all of my other modular buildings are placed on.

So my plan is to rebuild and upsize the shop while trying to preserve it's original design as much as possible.   The purpose of this blog post is to document the changes that I make as I embark on this project.   Think of it as a running journal.   Feel free to pop onto this blog post from time to time to see how things are progressing.   

Updates

Scroll to the bottom to see the latest updates.

Tue Jul 29


Deconstruction begins.  Basically pulled the building off of it's original baseplate and gutted he first floor interior.   I'm going to use a MILS style 32x32 baseplate on which to rebuild the Antique shop.

Wed Jul 30


Ok, so we have cleared away the mess and have temporarily placed the structure onto the 32x32 baseplate.  I'm going wth my standard sidewalk configuration.  In it's original form you had to climb a ladder to get to the second floor.  I'm going to add an outside staircase instead.

The shop will be widened by two studs and the original inoperable brick built doors will be replaced by Lego style doorways.  For now, I've placed the doors flush to the windows, but I'm considering indenting them to sort of follow Ohsojang's original premise.

I've used some linear plates to define the space of the new building footprint.  The main floor square footage will be almost doubled due to the extra 8 stud depth.

I've offset the building from the edge of the baseplate by 3 studs to allow for the protruding awning.  All of the dark gray area outside of the building will be tiled off.  I intend on preserving the original interiors tiling design as well.   Next steps is to collect some dark gray and dark tan masonry bricks and rebuild the side walls.

Thu July 31


Today, we have expanded the Antique shop's width by 2 studs and we have also inset the double doors.
The side walls have been extended in the picture above.  I still need to redo the yellow pipes.
All of the accessories that used to be on the left side of the shop have now been relocated under the new stairwell.  I've got some stair parts coming from Temu, so I will replace the temp stairs when I get them.

Here's the new interior space.  In addition to the original fixtures and furniture, I will need to add extra furnishings to fill in all of the new space.  Floor tiles need to be laid.   And of course I need to expand the rear wall and realign it to the building.

Fri Aug 1


Today, we updated the yellow piping on the side of the antique shop.  I'm going to replace the black 1x1 rounds with yellow ones in the next update.

Light gray tiling added to the perimeter of the shop.

This is a preliminary placement of stuff inside the antique shop.  I've added a few more knick knacks.

 I didn't throw those brick built doors away, instead they are now part of the antiques. 

Some of the stuff that was placed outside has now moved indoors, like the giant wreath and the sack. Got the first edition print of the Lepin News!

Tomorrow, I'll start re-laying the floor tile back inside the shop.   That's a wrap for today.

Sat Aug 2



Now we have installed the floor tiles.  It's following the original colour scheme and layout, just more of it.


And we have built a new folding rear wall, fashioned in somewhat the same way as the old wall but bigger.

I might have to add some window elements later to break up the plain brick wall.   So the first floor is pretty much finished.

I added an AC unit and meter to the yellow pipe.

Just a minor rearrangement of items under the stairs.




The next task is to start upgrading the second floor of the Antique shop.   Stay tuned for part two!

Feel free to check it out, if you like!

If you'd like to get your own Xbert Ohsojang designed Antique Shop, you can get it from Afobrick.com: https://afobrick.com/en-ca/products/xbert-66055-vintage-antique-shop?ref=oGOdUj_izrflQ
Don't forget to use my affiliate code itsnotlego to get another 5% off the price.

No comments:

Post a Comment